VIP Outdoors Offshore Long Leader Rig
HomeStore

VIP Outdoors Offshore Long Leader Rig

VIP Outdoors Offshore Long Leader Rig

$4.90

Original: $13.99

-65%
VIP Outdoors Offshore Long Leader Rig

$13.99

$4.90

The Story

Includes:

-Floating hard foam hand spool

-Non compressible float with top and bottom stainless steel swivel 

-30' of 80# leader.  Crimped with stainless steel swivels

VIP Outdoors Offshore Long Leader Rig - Image 2

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

Description

Includes:

-Floating hard foam hand spool

-Non compressible float with top and bottom stainless steel swivel 

-30' of 80# leader.  Crimped with stainless steel swivels